Re-signaling project completed by Boston and Maine on Fitchburg division between Soapstone, Mass, and Hoosick Falls, NY, includes 16.2 mi of double track equipped with automatic block signaling, and 14.1 mi of 2-track and 3-track road equipped with centralized traffic control for train operation by signal indication in both directions on all tracks; centralized traffic control section includes 4.75 mi of double track through Hoosac tunnel.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Hoosac tunnel interlocking and C.T.C.


    Additional title:

    Ry Signaling


    Published in:

    Publication date :

    1947


    Size :

    9 pages


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    Hoosac tunnel enlargement

    Engineering Index Backfile | 1928


    Interlocking and C.T.C. on Pennsylvania

    Engineering Index Backfile | 1948


    Report on hoosac tunnel collision

    Engineering Index Backfile | 1912


    Electrification of the hoosac tunnel

    Engineering Index Backfile | 1911


    New catenary construction for the hoosac tunnel

    Engineering Index Backfile | 1921