Re-signaling project completed by Boston and Maine on Fitchburg division between Soapstone, Mass, and Hoosick Falls, NY, includes 16.2 mi of double track equipped with automatic block signaling, and 14.1 mi of 2-track and 3-track road equipped with centralized traffic control for train operation by signal indication in both directions on all tracks; centralized traffic control section includes 4.75 mi of double track through Hoosac tunnel.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Hoosac tunnel interlocking and C.T.C.


    Weitere Titelangaben:

    Ry Signaling


    Erschienen in:

    Erscheinungsdatum :

    1947


    Format / Umfang :

    9 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch




    Hoosac tunnel enlargement

    Engineering Index Backfile | 1928


    Interlocking and C.T.C. on Pennsylvania

    Engineering Index Backfile | 1948


    Report on hoosac tunnel collision

    Engineering Index Backfile | 1912


    Electrification of the hoosac tunnel

    Engineering Index Backfile | 1911


    New catenary construction for the hoosac tunnel

    Engineering Index Backfile | 1921