Re-signaling project completed by Boston and Maine on Fitchburg division between Soapstone, Mass, and Hoosick Falls, NY, includes 16.2 mi of double track equipped with automatic block signaling, and 14.1 mi of 2-track and 3-track road equipped with centralized traffic control for train operation by signal indication in both directions on all tracks; centralized traffic control section includes 4.75 mi of double track through Hoosac tunnel.
Hoosac tunnel interlocking and C.T.C.
Ry Signaling
Railway Signaling ; 40 , n 2
1947
9 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1928
Interlocking and C.T.C. on Pennsylvania
Engineering Index Backfile | 1948
Report on hoosac tunnel collision
Engineering Index Backfile | 1912
Electrification of the hoosac tunnel
Engineering Index Backfile | 1911
New catenary construction for the hoosac tunnel
Engineering Index Backfile | 1921