Progress report dealing with structure, systems, flight test, maintenance and support of short-haul jet airliner, being built by British Aircraft Corp; test program included static and fatigue tests, and detail structural tests; system test schedule comprises hydraulic systems rig combined with flying controls rig, air system rig including distribution system, cabin airflow and conditioning checks, fuel system rigs, electrical protection system, generator control system, and constant-speed drive test rigs. Condensed version of paper before Transport Aircraft Design and Operations Meeting, Seattle, Wash, Aug 11 1964.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    BAC one-eleven development progress


    Additional title:

    Flight


    Contributors:

    Published in:

    Flight ; 86 , n 2894


    Publication date :

    1964


    Size :

    3 pages


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    Progress with development of B.A.C. One-Eleven

    Thomas, J.P. | Engineering Index Backfile | 1964


    BAC Three-Eleven - project progress

    British Aircraft Corporation | SLUB | 1969



    Progress with the Development of the B.A.C. One-Eleven

    Prothero Thomas, J. | Emerald Group Publishing | 1964


    Lotus 2-ELEVEN

    Online Contents | 2007