Progress report dealing with structure, systems, flight test, maintenance and support of short-haul jet airliner, being built by British Aircraft Corp; test program included static and fatigue tests, and detail structural tests; system test schedule comprises hydraulic systems rig combined with flying controls rig, air system rig including distribution system, cabin airflow and conditioning checks, fuel system rigs, electrical protection system, generator control system, and constant-speed drive test rigs. Condensed version of paper before Transport Aircraft Design and Operations Meeting, Seattle, Wash, Aug 11 1964.
BAC one-eleven development progress
Flight
Flight ; 86 , n 2894
1964
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Progress with development of B.A.C. One-Eleven
Engineering Index Backfile | 1964
|BAC Three-Eleven - project progress
SLUB | 1969
|Progress with the development of the bac one- eleven
AIAA | 1964
|Progress with the Development of the B.A.C. One-Eleven
Emerald Group Publishing | 1964
|Online Contents | 2007