Shipbuilding activities at shipyards of Burmeister and Wain, Copenhagen; insufficient supply of steel and coal prevent all-out ship production; largest cranes have load limit of 12 1/2 tons; material-handling equipment is limiting factor in size of assemblies to be built; prefabrication confined chiefly to double-bottom sections, forepeaks, deck plating, etc; because of shortage of welding equipment and of limited crane capacity, arc welding has not achieved wide application in Danish shipbuilding.
Denmark's largest shipyard goes back to work
Mar Eng Shipg Rev
Marine Engineering and Shipping Review ; 50 , n 10
1945
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Shipyard focus - This edition places the spotlight on Denmark's Ødense Steel Shipyard
Online Contents | 2008
The largest shipyard in the world
Engineering Index Backfile | 1920
Japanese fill bay site, build largest shipyard
Engineering Index Backfile | 1969
Online Contents | 1997
World's largest crane to serve West Coast Naval Shipyard
Engineering Index Backfile | 1947
|