Detailed account of record construction in 10 days, 4 hr and 45 min of single track, 1752-ft bridge across river at Wesel. (see also Ry Eng and Maintenance v 41 n 6 June 1945 p 574-7)
Railroad over Rhine
Ry Age
Railway Age ; 118 , n 17
1945
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1945
|Construction of new railroad bridge over the Rhine at Ragaz
Engineering Index Backfile | 1928
|Raising the railroad bridge over the rhine between buchs and Schaan
Engineering Index Backfile | 1928
|Railway bridge over Rhine at Spyck
Engineering Index Backfile | 1945
Application Report - Owner Takes Over Repowered Rhine Freighter
Online Contents | 1993