Method of raising long (about 480 m.) steel-truss railroad bridge on Switzerland-Liechtenstein border, 1.7 m. above original level, necessitated by destructive floods; hydraulic presses used.
Raising the railroad bridge over the rhine between buchs and Schaan
Die Hebung der Eisenbahn-Rheinbruecke zwischen Buchs und Schaan
Schweizerische Bauzeitung ; 92 , n 8
1928
6 pages
14 Figs.
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1945
|Engineering Index Backfile | 1945
|Construction of new railroad bridge over the Rhine at Ragaz
Engineering Index Backfile | 1928
|Railway bridge over Rhine at Spyck
Engineering Index Backfile | 1945
Reconstruction of railway bridge over Rhine River between Chalampe and Neuenburg
Engineering Index Backfile | 1946
|