Replace 3-track structure to new grade and track alignment. (1000 w.) (79750)
Reconstruction executed safely of complicated elevated railway
Eng News-Rec
1917
Ills.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Complicated railway bridge movement
Engineering Index Backfile | 1912
Reconstruction of part of the Manhattan elevated railway
Engineering Index Backfile | 1910
Engineering Index Backfile | 1895
Engineering Index Backfile | 1895
Engineering Index Backfile | 1895