Brief illustrated description of the removal at Westerly, Rhode Island, of two heavy single-track deck spans on the N. Y., N. H., and H. R. R. without interruption of traffic. (1500 w.) (No 36780)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Complicated railway bridge movement


    Additional title:

    Eng Rec


    Published in:

    Publication date :

    1912


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English


    Keywords :


    Reconstruction executed safely of complicated elevated railway

    Fried, George D. | Engineering Index Backfile | 1917


    Moving railway bridge

    Roe, D.B. | Engineering Index Backfile | 1950


    Removable railway bridge

    Engineering Index Backfile | 1931


    Railway bridge repair

    Engineering Index Backfile | 1956


    The railway bridge

    Engineering Index Backfile | 1925