Rail haulage system at Arizona mine is designed to move 12 180-ton payload trains/hour through rotary dumps pulled by 23-ton trolley locomotives; rail system is laid out as simple double loop with one-way traffic of continuous haul and is comprised of 30 mi of track; at full production, 12 23-ton trolley locomotives, each pulling 15 12-ton capacity ore cars, and 15 8-ton battery locomotives engaged in development, service and supply, will be in operation.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Installing new rail haulage system at san manuel


    Additional title:

    Min Eng


    Contributors:
    Acton, L.C. (author) / Massey, C.G. (author)

    Published in:

    Publication date :

    1962


    Size :

    37 pages


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    Rail haulage

    Pearse, G. | Tema Archive | 1995


    Rail haulage at climax

    Cleeves, C.A. | Engineering Index Backfile | 1957


    Welded rail for mine haulage ways

    Boomsliter, G.P. / Cather, C.H. | Engineering Index Backfile | 1940


    Rail haulage systems in underground mines

    Oeberg, B. | Tema Archive | 1979


    Haulage by rail and rubber tires

    Topp, H.J.B. | Engineering Index Backfile | 1950