Rail haulage system at Arizona mine is designed to move 12 180-ton payload trains/hour through rotary dumps pulled by 23-ton trolley locomotives; rail system is laid out as simple double loop with one-way traffic of continuous haul and is comprised of 30 mi of track; at full production, 12 23-ton trolley locomotives, each pulling 15 12-ton capacity ore cars, and 15 8-ton battery locomotives engaged in development, service and supply, will be in operation.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Installing new rail haulage system at san manuel


    Weitere Titelangaben:

    Min Eng


    Beteiligte:
    Acton, L.C. (Autor:in) / Massey, C.G. (Autor:in)

    Erschienen in:

    Erscheinungsdatum :

    1962


    Format / Umfang :

    37 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    Rail haulage

    Pearse, G. | Tema Archiv | 1995


    Rail haulage at climax

    Cleeves, C.A. | Engineering Index Backfile | 1957


    Welded rail for mine haulage ways

    Boomsliter, G.P. / Cather, C.H. | Engineering Index Backfile | 1940


    Rail haulage systems in underground mines

    Oeberg, B. | Tema Archiv | 1979


    Haulage by rail and rubber tires

    Topp, H.J.B. | Engineering Index Backfile | 1950