Progress report on construction of lock having chamber 360 ft by 60 ft in plan; excavation and wall-concreting progressing rapidly with simple plant set-up; lock being built to permit possible increase in height of dam; linedrilling and broaching solid-rock foundation for lock walls.
Lock construction at Dam 3, Tennessee River
Eng News-Rec
Engineering News-Record ; 111 , n 7
1933
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Filling and emptying system Cordell hull navigation lock Cumberland river, Tennessee
Engineering Index Backfile | 1966
|Engineering Index Backfile | 1946
|