Engineering report covers satellite, communications ground stations and telemetry and control ground stations; description of each of Syncom Satellite System Subsystems in addition to their operation and performance is presented; time period covered by report is from launch on July 26 1963 from Cape Canaveral through first 150 days in orbit.
Syncom engineering report
NASA -- Tech Report
1966
160 pages
Report
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Syncom engineering report, volume II
NTRS | 1967
Syncom engineering report -- 2
Engineering Index Backfile | 1967
Advanced Syncom - Syncom II Summary Report
NTIS | 1963
SYNCOM engineering report, volume I
NTRS | 1966
Syncom Engineering Report, Volume I
NTIS | 1966