Method of regirdering single-track meter-gage bridge without interruption to traffic, is believed to be new and capable of modification to meet most cases; essential feature of scheme was service span to carry traffic over gap between any two piers while old permanent span was being removed and new one put in its place. (See also - discussion p 257-263)
The regirdering of the railway-bridge over the Krishna river Madras and southern Mahratta railway, India
Instn. Civil Engrs. -- Min. Proc
Institution of Civil Engineers -- Minutes of Proceedings ; 227 , 1st Part
1929
12 pages
1 Fig.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Baldwin locomotives for the Madras and Southern Mahratta Railway
Engineering Index Backfile | 1924
2-8-2 locomotives, madras and southern mahratta railway
Engineering Index Backfile | 1929
The re-girdering of a railway bridge over the Krishna River
Engineering Index Backfile | 1929
|Conduit electric railway at Madras, India
Engineering Index Backfile | 1895
Metre gauge locomotives for the Madras and Southern Mahratta Railway (India)
Engineering Index Backfile | 1924