The capacity of the Smelter Hill line is said to have been increased 108 per cent since road was electrified.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Electric operations -- Butte, Anaconda and Pacific


    Additional title:

    Ry. Age


    Contributors:

    Published in:

    Railway Age ; 65 , n 24


    Publication date :

    1920


    Size :

    2 pages


    Remarks:

    2 Figs.


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    Butte, Anaconda and pacific maintenance methods

    Bellinger, F.W. | Engineering Index Backfile | 1927




    Contact system of the Butte, Anaconda and pacific railway

    Cox, J.B. | Engineering Index Backfile | 1915