Inspection schedule for electric locomotives eliminates all unnecessary work; brush life has been increased 1000 per cent.
Butte, Anaconda and pacific maintenance methods
Ry. Elec. Engr
Railway Electrical Engineer ; 18 , n 4
1927
5 pages
4 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Electric operations -- Butte, Anaconda and Pacific
Engineering Index Backfile | 1920
|Electrification of the Butte, Anaconda and Pacific
Engineering Index Backfile | 1914
Electrification of the Butte, Anaconda and pacific
Engineering Index Backfile | 1913
Electrical operation of the Butte, Anaconda and pacific railway
Engineering Index Backfile | 1914
|Contact system of the Butte, Anaconda and pacific railway
Engineering Index Backfile | 1915
|