Stresses in 550-ft. arch span were redistributed by changing crown shims. Floor was reconstructed for E 70 loading.
Niagara railway arch reinforced for heaviest traffic
Eng. News-Record
Engineering News-Record ; 83 , n 19
1919
5 pages
4 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Steel-plate drip floor for Niagara railway arch
Engineering Index Backfile | 1919
Handling heaviest future traffic electrically
Engineering Index Backfile | 1923
Fortescue opens the world's heaviest haul railway
IuD Bahn | 2008
|New Niagara Gorge arch nearing completion
Engineering Index Backfile | 1924
Extending the life of the Niagara Gorge arch
Engineering Index Backfile | 1920