Description of manner in which massed bridge gangs on Missouri Pacific Lines in Texas and Louisiana, employing highly effective methods and equipment, rebuilt 72 panels of 142-panel treated pile bridge, adequate for train movements, in 150 hr, completing work later under traffic; how tractor bulldozer was used most effectively in clearing away debris and for transporting materials for rebuilding operations.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Gangs set enviable record in rebuilding long burned-out bridge


    Additional title:

    Ry Eng Maintenance


    Published in:

    Publication date :

    1944


    Size :

    3 pages


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English





    Rebuilding London Bridge

    Abbott, Jame | IuD Bahn | 2011



    Rebuilding CSXT's Ninemile Bridge

    Chapin, Steven J. / Plott, Harold W. / Edmonds; Frank C. | IuD Bahn | 1997