Description of manner in which massed bridge gangs on Missouri Pacific Lines in Texas and Louisiana, employing highly effective methods and equipment, rebuilt 72 panels of 142-panel treated pile bridge, adequate for train movements, in 150 hr, completing work later under traffic; how tractor bulldozer was used most effectively in clearing away debris and for transporting materials for rebuilding operations.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Gangs set enviable record in rebuilding long burned-out bridge


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print




    Rebuilding London Bridge

    Abbott, Jame | IuD Bahn | 2011



    Rebuilding CSXT's Ninemile Bridge

    Chapin, Steven J. / Plott, Harold W. / Edmonds; Frank C. | IuD Bahn | 1997