Centralized traffic control installed on 175.6 mi of single track main line between Daggett, Calif, and Las Vegas, Nev; project includes entire operating subdivision which is controlled by one centralized traffic control machine located at one end, and made possible by use of carrier current to cut centralized traffic control line codes into three separate operating sections. (See also Ry Signaling v 36 n 9 Sept 1943 p 472-80, 489)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Union Pacific installs C.T.C. on 175 miles of single track


    Additional title:

    Ry Age


    Published in:

    Railway Age ; 115 , n 10


    Publication date :

    1943


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English