Particulars of new methods of track reconstruction adopted by Pacific Elec. Ry. because of increase in traffic congestion; special work is made up in advance; gangs comprise about 50 men; work is done in two nine-hour shifts; under favorable conditions one block of double track is rebuilt in 20 days; average rates of progress for various jobs are given.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Rebuilding track amid traffic congestion


    Additional title:

    Elec. Ry. Jl


    Contributors:

    Published in:

    Publication date :

    1925


    Size :

    5 pages


    Remarks:

    15 Figs.


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    Difficult track rebuilding job

    Smith, C.A. | Engineering Index Backfile | 1937


    Rebuilding track at low cost

    Walker, D.H. | Engineering Index Backfile | 1929


    Rebuilding track at limited cost

    Walker, D.H. | Engineering Index Backfile | 1930


    Rebuilding track at low cost

    Walker, D.H. | Engineering Index Backfile | 1929


    Rebuilding street railway track at Cincinnati

    Engineering Index Backfile | 1928