Particulars of new methods of track reconstruction adopted by Pacific Elec. Ry. because of increase in traffic congestion; special work is made up in advance; gangs comprise about 50 men; work is done in two nine-hour shifts; under favorable conditions one block of double track is rebuilt in 20 days; average rates of progress for various jobs are given.
Rebuilding track amid traffic congestion
Elec. Ry. Jl
Electric Railway Journal ; 66 , n 25
1925
5 pages
15 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Difficult track rebuilding job
Engineering Index Backfile | 1937
|Engineering Index Backfile | 1929
|Rebuilding track at limited cost
Engineering Index Backfile | 1930
|Engineering Index Backfile | 1929
|Rebuilding street railway track at Cincinnati
Engineering Index Backfile | 1928