Describes large graving dock of T. W. Greenwell and Co., Ltd., for ship, engine and boiler repairs; length, 515 ft.; breadth of entrance, 75 ft.; draft over cill at H. W. O. S. T., 26 ft., draft over cill at L. W. O. S. T., 11 ft. 6 in.
Dry dock opened at Sunderland
Shipbldg. Shipg. Rec
Shipbuilding and Shipping Record ; 26 , n 5
1925
2 pages
3 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Messrs. T.W. Greenwell and Co.'s dry dock, Sunderland
Engineering Index Backfile | 1926
World's largest totally enclosed 'ship factory' opened in sunderland
Tema Archive | 1976
New dry dock opened at belfast
Engineering Index Backfile | 1968
Engineering Index Backfile | 1939
TIBKAT | 1967
|