Method for ready estimation of tanker construction costs; displacement and installed horsepower are shown to be principal factors in determination of first cost; calculation of operating cost; examples for oil tanker of 40,000 tons displacement and 20,000 shp; prediction of savings resulting from duplication in shipbuilding. Before Soc Naval Architects and Mar Engrs, North California Section. (see also - n 3 July 18 p 71-4, n 4 July 25 p 114-6, n 5 Aug 1 p 146-8; Mar Eng v 62 n 4 Apr 1957 p 61-7)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Cost studies -- Tools for tanker design


    Additional title:

    Shipbldg Shipg Rec


    Contributors:
    Benford, H. (author)

    Published in:

    Shipbuilding and Shipping Record ; 90 , n 6 ; p 177-180


    Publication date :

    1957


    Size :

    4 pages


    Type of media :

    Report


    Type of material :

    Print


    Language :

    English


    Keywords :


    Cost studies -- Tools for tanker design

    Benford, H. | Engineering Index Backfile | 1957


    Tanker cost elasticities revisited

    Glen, David / Reid, Samuel | Taylor & Francis Verlag | 2010


    Tanker cost elasticities revisited

    Glen, David | Online Contents | 2010


    Modern tanker design

    Pluymert, N.J. | Engineering Index Backfile | 1939


    Modern tanker design

    Pluymert, N.J. | Engineering Index Backfile | 1939