Method for ready estimation of tanker construction costs; displacement and installed horsepower are shown to be principal factors in determination of first cost; calculation of operating cost; examples for oil tanker of 40,000 tons displacement and 20,000 shp; prediction of savings resulting from duplication in shipbuilding. Before Soc Naval Architects and Mar Engrs, North California Section. (see also - n 3 July 18 p 71-4, n 4 July 25 p 114-6, n 5 Aug 1 p 146-8; Mar Eng v 62 n 4 Apr 1957 p 61-7)
Cost studies -- Tools for tanker design
Shipbldg Shipg Rec
Shipbuilding and Shipping Record ; 90 , n 6 ; p 177-180
1957
4 pages
Report
Englisch