Steam train services on Charing Cross to Hastings via Tunbridge Wells line to be replaced by diesel electric services; 6-coach vestibule corridor train sets provided; each consists of two diesel electric motor coaches with four corridor trailer coaches semipermanently coupled between them; each coach has 500-hp diesel generator set, to give total of 1000 hp for 6-coach or 2000 hp for 12-coach train.
Diesel-electric trains for Southern Region
Engineer
Engineer ; 203 , n 5285
1957
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Buffet Cars for Southern Region Diesel-Electric Trains
Engineering Index Backfile | 1958
Six Two-Car Diesel-electric trains for Southern
Engineering Index Backfile | 1939
Six two-car Diesel-electric trains for southern
Engineering Index Backfile | 1939
Southern trains its Diesel forces
Engineering Index Backfile | 1945
New two Car Diesel-electric trains for Southern railway system
Engineering Index Backfile | 1939