Port facilities for loading and unloading super tankers of 50,000 dwt and above are unavailable in most areas: operation of sub-sea terminals in Eastern Mediterranean, at Bombay and elsewhere has shown that big tankers can be loaded and unloaded quickly and safely in unprotected harbors under most weather conditions.
Super tanker problem
World Petroleum
World Petroleum ; 27 , n 12
1956
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1958
Engineering Index Backfile | 1948
British-built super tanker for Esso
Engineering Index Backfile | 1954
Super-Tanker - Mehr Sicherheit beim Gefahrguttransport
Automotive engineering | 1987
|Vibration measurements on 32,000 ton D.W. super tanker
Engineering Index Backfile | 1956
|