Port facilities for loading and unloading super tankers of 50,000 dwt and above are unavailable in most areas: operation of sub-sea terminals in Eastern Mediterranean, at Bombay and elsewhere has shown that big tankers can be loaded and unloaded quickly and safely in unprotected harbors under most weather conditions.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Super tanker problem


    Additional title:

    World Petroleum


    Contributors:
    Hale, J.W. (author) / O'Connel, H. (author)

    Published in:

    World Petroleum ; 27 , n 12


    Publication date :

    1956


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English


    Keywords :


    Coastal super tanker

    Engineering Index Backfile | 1958


    Super-tanker characteristics

    Engineering Index Backfile | 1948


    British-built super tanker for Esso

    Engineering Index Backfile | 1954


    Super-Tanker - Mehr Sicherheit beim Gefahrguttransport

    Strampp,J.M. | Automotive engineering | 1987


    Vibration measurements on 32,000 ton D.W. super tanker

    Okabe, T. / Hirata, K. / Kumai, T. | Engineering Index Backfile | 1956