Theoretical and practical data on tie renewal under continuous welded rail; forces and movements, role of rail anchors, and rail under tension; required sequency of operation.
Renewal of bridge and trestle ties under welded rail
Ry Track Structures
Railway Track and Structures ; 63 , n 10
1967
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Power tools aid trestle renewal
Engineering Index Backfile | 1936
|Engineering Index Backfile | 1964
|Engineering Index Backfile | 1895
Welded steel railroad trestle replaces wooden structure
Engineering Index Backfile | 1939
|Main line gets welded rail on concrete ties
Engineering Index Backfile | 1966