Performance data for units in service; in ordering 10 additional locomotives, railroad requests following changes: increased fuel capacity; 40-in. single-wear Class A wheels; improved equipment arrangement; improved piping; air brake modifications to meet Union Pacific practice; improved engine room drainage; and, in some cases, parts and materials better suited to railroad operation.
What union pacific gas turbines have been doing
Ry Age
Railway Age ; 133 , n 26 ; p 44-47
1952
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
What We Have Been Doing on ATC Safety Management
British Library Conference Proceedings | 2002
|How gas turbines perform on union pacific
Engineering Index Backfile | 1953
Why some railroads have been doing well in generally unfavorable environment
Engineering Index Backfile | 1950
|Dyna-Soar: What Might Have Been
AIAA | 2016
|Crew-Centered Operations: What HAL 9000 Should Have Been
NTIS | 2005
|