Performance data for units in service; in ordering 10 additional locomotives, railroad requests following changes: increased fuel capacity; 40-in. single-wear Class A wheels; improved equipment arrangement; improved piping; air brake modifications to meet Union Pacific practice; improved engine room drainage; and, in some cases, parts and materials better suited to railroad operation.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    What union pacific gas turbines have been doing


    Weitere Titelangaben:

    Ry Age


    Erschienen in:

    Railway Age ; 133 , n 26 ; p 44-47


    Erscheinungsdatum :

    1952


    Format / Umfang :

    4 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch




    What We Have Been Doing on ATC Safety Management

    Liu, Y. / Flight Safety Foundation / International Federation of Airworthiness et al. | British Library Conference Proceedings | 2002


    How gas turbines perform on union pacific

    Engineering Index Backfile | 1953



    Dyna-Soar: What Might Have Been

    Tishkoff, Julian M. | AIAA | 2016


    Crew-Centered Operations: What HAL 9000 Should Have Been

    D. J. Korsmeyer / D. J. Clancy | NTIS | 2005