Mechanization of tie renewal and surfacing work on New York Central; equipment assigned for work includes Kershaw ballast regulator for pulling ballast in position for tampers, 2 production tampers which work on alternate ties, Nordberg Trakliner with Line Indicator and Raco track wrench.
Track gangs aim at better riding conditions
Ry Track Structures
Railway Track and Structures ; 59 , n 1
1963
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Gangs and their relation to track maintenance
Engineering Index Backfile | 1913
|Major jobs done by specialized track gangs
Engineering Index Backfile | 1964
The rating of track for distribution of maintenance gangs
Engineering Index Backfile | 1929
|Emerald Group Publishing | 2009
|