Methods and equipment used for track maintenance at Missouri Pacific are described including undertrack-plow operation, tie renewals and track improvement by small specially equipped lining and surfacing units whose equipment is double-shifted to increase utilization and production.
Major jobs done by specialized track gangs
Ry Track Structures
Railway Track and Structures ; 60 , n 1
1964
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Specialized or general work for bridge and building gangs?
Engineering Index Backfile | 1932
Track gangs aim at better riding conditions
Engineering Index Backfile | 1963
Gangs and their relation to track maintenance
Engineering Index Backfile | 1913
|The rating of track for distribution of maintenance gangs
Engineering Index Backfile | 1929
|Emerald Group Publishing | 2009
|