Description of works including salvage and repositioning of 3 hulks in East Lagoon to permit deep dredging and to allow ships to maneuver on inshore side of new pier without losing protection previously afforded, dredging, mainly on inshore side of new pier, and reconstruction and enlargement of existing East Wharf to form new deep water berths; ground conditions, design requirements, and construction materials; details of design of wharf structure and surface works; piling plant and pile driving.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Further developments at Singapore Harbour


    Additional title:

    Dock Harbour Authority


    Contributors:

    Published in:

    Dock and Harbour Authority ; 44 , n 516 ; p 172-176


    Publication date :

    1963


    Size :

    5 pages


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    Developments at Whitstable Harbour

    Hardy, B.E. | Engineering Index Backfile | 1963


    Developments in harbour radar

    Engineering Index Backfile | 1951


    Dock and harbour developments

    Cunningham, B. | Engineering Index Backfile | 1932


    Developments in harbour radar

    Engineering Index Backfile | 1951


    Harbour developments at galway

    Engineering Index Backfile | 1966