Description of works including salvage and repositioning of 3 hulks in East Lagoon to permit deep dredging and to allow ships to maneuver on inshore side of new pier without losing protection previously afforded, dredging, mainly on inshore side of new pier, and reconstruction and enlargement of existing East Wharf to form new deep water berths; ground conditions, design requirements, and construction materials; details of design of wharf structure and surface works; piling plant and pile driving.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Further developments at Singapore Harbour


    Weitere Titelangaben:

    Dock Harbour Authority


    Beteiligte:
    Pickles, F.B. (Autor:in) / Tapp, J.W.T. (Autor:in)

    Erschienen in:

    Dock and Harbour Authority ; 44 , n 516 ; p 172-176


    Erscheinungsdatum :

    1963


    Format / Umfang :

    5 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    Developments in harbour radar

    Engineering Index Backfile | 1951


    Developments at Whitstable Harbour

    Hardy, B.E. | Engineering Index Backfile | 1963


    Dock and harbour developments

    Cunningham, B. | Engineering Index Backfile | 1932


    Developments in harbour radar

    Engineering Index Backfile | 1951


    Harbour developments at galway

    Engineering Index Backfile | 1966