Design features of new oil jetty and improvement of navigation channel which will make port accessible to vessels of up to 40,000 tons dw capacity and 10.80 m draft; hose-handling frame equipped with 4 sets of flexibles, of 200 mm diam, supported by hand-operated pulley blocks and other oil handling equipment installed are described.
New oil jetty at port of donges
Dock Harbour Authority
Dock and Harbour Authority ; 44 , n 517
1963
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Port of Algiers: Mustapha Jetty -- I
Engineering Index Backfile | 1936
|Port of Algiers: Mustapha Jetty -- II
Engineering Index Backfile | 1936
|Port of Algiers: Mustapha Jetty -- III
Engineering Index Backfile | 1936
|Online Contents | 1997
Engineering Index Backfile | 1948
|