Reconstruction of Gallions Lock Entrance; dams at both ends and deep well groundwater lowering system around area were required to increase effective locking depth by altering lock bottom; other work included various repair and improvements, new gates, replacement of sides of curved invert by reinforced concrete knees, etc.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Royal Group of Docks, Port of London


    Additional title:

    Dock Harbour Authority


    Contributors:
    Spear, G.L. (author)

    Published in:

    Publication date :

    1956


    Size :

    7 pages


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English


    Keywords :


    London. Improvements at Royal Docks, Port of London Authority

    Liddell, R.R. | Engineering Index Backfile | 1939


    London. Improvements at Royal Docks, Port of London Authority

    Liddell, R.R. | Engineering Index Backfile | 1939


    No. 4 berth, Royal Victoria Docks, Port of London

    Cook, T.E. | Engineering Index Backfile | 1961



    Docks of London

    Shepherd-Barron, W.P. | Engineering Index Backfile | 1953