Reconstruction of Gallions Lock Entrance; dams at both ends and deep well groundwater lowering system around area were required to increase effective locking depth by altering lock bottom; other work included various repair and improvements, new gates, replacement of sides of curved invert by reinforced concrete knees, etc.
Royal Group of Docks, Port of London
Dock Harbour Authority
Dock and Harbour Authority ; 37 , n 427
1956
7 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
London. Improvements at Royal Docks, Port of London Authority
Engineering Index Backfile | 1939
|London. Improvements at Royal Docks, Port of London Authority
Engineering Index Backfile | 1939
|No. 4 berth, Royal Victoria Docks, Port of London
Engineering Index Backfile | 1961
|Road and railway lighting at port of London authority docks
Engineering Index Backfile | 1931
Engineering Index Backfile | 1953
|