Considers features of the traffic as an example of high-class operation when traffic density, capacity, safety, comfort, speed and reliability are considered. Deals with the evening rush hour, from 5 to 6 P. M. (3000 w.) (No. 3096)
Traffic on the Brooklyn Bridge, New York City
R R Age Gaz
1909
Plate
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Traffic capacity of Brooklyn Bridge
Engineering Index Backfile | 1890
Brooklyn bridge rebuilt for today's traffic
Engineering Index Backfile | 1951
The bridge transportation system between New York and Brooklyn
Engineering Index Backfile | 1897
Engineering Index Backfile | 1894
Engineering Index Backfile | 1894