Even in fills of moderate height, jacking method reduces culvert-placement cost in addition to avoiding traffic interruptions.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Jacking a culvert under traffic and under the estimate in Sheridan County, Kansas


    Additional title:

    Highway Mag


    Contributors:
    Mowry, A.J. (author)

    Published in:

    Publication date :

    1928


    Size :

    3 pages


    Remarks:

    5 Figs.


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English


    Keywords :


    Jacking culvert through embankment cuts cost two-thirds

    Swartout, W.C. | Engineering Index Backfile | 1926



    Jacking culvert through railway fill aided by top shield

    Tunnicliff, N.H. | Engineering Index Backfile | 1928


    Jacking trolley for quickly assembling culvert sections and control method

    ZHU ZHENYE / WANG JIAQING / CHEN WENYIN et al. | European Patent Office | 2021

    Free access