Even in fills of moderate height, jacking method reduces culvert-placement cost in addition to avoiding traffic interruptions.
Jacking a culvert under traffic and under the estimate in Sheridan County, Kansas
Highway Mag
Highway Magazine ; 19 , n 2
1928
3 pages
5 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Jacking culvert through embankment cuts cost two-thirds
Engineering Index Backfile | 1926
|The placing of culvert pipes by jacking or tunnelling
Engineering Index Backfile | 1929
Jacking culvert through railway fill aided by top shield
Engineering Index Backfile | 1928
|Jacking trolley for quickly assembling culvert sections and control method
European Patent Office | 2021
|Engineering Index Backfile | 1921