Replacement of three interlockings, with installation of remotely controlled power switches and signals to facilitate train operations on 5 mi of line over summit of Allegheny mountains, near Alleghany, Va. (see also Ry Age v 101 n 7 Aug 15 1936 p 238-40)
Centralized control on Chesapeake and Ohio
Ry Signaling
Railway Signaling ; 29 , n 10
1936
6 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Centralized control on Chesapeake and Ohio
Engineering Index Backfile | 1936
Centralized traffic control on Chesapeake and Ohio
Engineering Index Backfile | 1935
Centralized traffic control on Chesapeake and Ohio
Engineering Index Backfile | 1941
Centralized traffic control on Chesapeake and Ohio
Engineering Index Backfile | 1935
Automatic block and centralized traffic control on Chesapeake and Ohio
Engineering Index Backfile | 1941