The invention discloses a hoisting mechanism for a water taking and draining box culvert. The hoisting mechanism comprises a cross beam, a supporting column and a second fixing plate. When the hoisting mechanism for the water taking and draining box culvert is used, firstly, the hoisting mechanism is assembled, the supporting columns are fixed to the ground through the mounting holes in the fixing bottom plate, then the cross beams are placed above the corresponding supporting columns, and meanwhile, the cross beams are fixed through the first connecting flanges and the second connecting flanges; then the first I-shaped steel and the second I-shaped steel are spliced, the first I-shaped steel and the second I-shaped steel are fixed through angle iron and bolts, then a second fixing plate is taken and placed above the splicing position of the first I-shaped steel and the second I-shaped steel, and meanwhile the angle iron and the second fixing plate are locked through bolts; at the moment, the first I-shaped steel and the second I-shaped steel are locked between the angle iron and the second fixing plate together, the first fixing plate and the first I-shaped steel are fixed through bolts, and the third fixing plate and the second I-shaped steel are fixed through bolts.
本发明公开了一种取排水箱涵用吊装机构,包括横梁、支撑柱和第二固定板。该取排水箱涵用吊装机构,使用时,首先对吊装机构进行组装,将支撑柱通过固定底板上的安装孔与地面固定,然后将横梁放置在对应支撑柱的上方,同时通过第一连接法兰和第二连接法兰进行固定,然后将第一工字钢和第二工字钢进行拼接,并通过角铁采用螺栓对第一工字钢和第二工字钢进行固定,然后拿取第二固定板放置在第一工字钢和第二工字钢的拼接处上方,同时通过螺栓将角铁与第二固定板锁紧,此时将第一工字钢和第二工字钢一并锁紧在角铁与第二固定板之间,将第一固定板通过螺栓与第一工字钢进行固定,将第三固定板通过螺栓与第二工字钢进行固定。
Hoisting mechanism for water taking and draining box culvert
一种取排水箱涵用吊装机构
2022-03-11
Patent
Electronic Resource
Chinese
IPC: | B66C Krane , CRANES |
Integral box culvert piece hoisting method and hoisting device
European Patent Office | 2022
|