The invention discloses a train operation scheduling real-time adjustment method and system considering a jump stop strategy, and the method comprises the steps: obtaining train operation adjustment data and passenger flow dynamic fluctuation data based on an original train operation plan, station real-time passenger flow data and predicted OD data; establishing a mathematical model with urban rail system capability and service quality as targets, and obtaining a train scheduling and jump stop adjustment strategy based on train operation adjustment data and passenger flow dynamic fluctuation data; and determining the station dwell time and the interval operation time of the jump stop train at each station based on the train dispatching and stopping and jump stop adjustment strategy and in combination with the real-time train dispatching condition, and performing real-time adjustment on the train operation. The comprehensive optimization problem based on the jump stop strategy is researched, and a novel thought is provided for the train operation control method in the aspects of improving the performance of the urban rail transit system and improving the passenger service quality in real time.
一种考虑跳停策略的列车运行调度实时调整方法及系统,方法包括基于原有列车运行计划、车站实时客流数据以及预测OD数据,得到列车运行调整数据以及客流动态波动数据;建立以城轨系统能力与服务质量为目标的数学模型,基于列车运行调整数据以及客流动态波动数据,得到列车调度和跳停调整策略;基于列车调停和跳停调整策略并结合实时列车调度情况,确定跳停列车在各车站的停站时间以及区间运行时间,对列车运行进行实时调整。本发明研究了基于跳停策略的综合优化问题,在改善城市轨道交通系统性能和实时提高乘客服务质量方面对列车运行控制方法提出一种新颖的思路。
Train operation scheduling real-time adjustment method and system considering jump stop strategy
一种考虑跳停策略的列车运行调度实时调整方法及系统
2025-05-02
Patent
Electronic Resource
Chinese
IPC: | B61L Leiten des Eisenbahnverkehrs , GUIDING RAILWAY TRAFFIC |
Intelligent train operation adjustment system and method based on real-time passenger flow
European Patent Office | 2024
|INTELLIGENT TRAIN OPERATION ADJUSTMENT SYSTEM AND METHOD BASED ON REAL-TIME PASSENGER FLOW
European Patent Office | 2021
|