This report presents the results of composite tests, Project Mercury, conducted 7 March 1963, and subsequent post-composite testing. Pertinent systems level testing is also included. Final acceptance of Missile 130D was based on successful performance of all missile systems in accordance with Missile Composite Checkout Procedure, and Missile Factory Acceptance Test Plan and Test Evaluation. Before conducting the missile composite checkout, successful performance of each individual system installed on the missile must be determined. (Author)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite