This report presents the results of composite tests, Project Mercury, conducted 7 March 1963, and subsequent post-composite testing. Pertinent systems level testing is also included. Final acceptance of Missile 130D was based on successful performance of all missile systems in accordance with Missile Composite Checkout Procedure, and Missile Factory Acceptance Test Plan and Test Evaluation. Before conducting the missile composite checkout, successful performance of each individual system installed on the missile must be determined. (Author)
Factory Acceptance Testing of Missile 130D
1963
88 pages
Report
Keine Angabe
Englisch
Missile Technology , Surface to surface missiles , Operational readiness , Abort , Detectors , Electrical equipment , Flight control systems , Propellant control , Liquid rocket propellants , Liquid propellant rocket engines , Command and control systems , Guided missile ranges , Telemeter systems , Vernier rocket engines , Ignition systems , Safety , Inertial guidance , Azusa , Mercury project
Factory Acceptance Testing of Missile 124D
NTIS | 1962
Factory Acceptance Testing of Missile 32E
NTIS | 1961
Factory Acceptance Testing of Missile 31F
NTIS | 1961
Factory Acceptance Testing of Missile 109D
NTIS | 1961
Factory Acceptance Testing of Missile 39E
NTIS | 1961