Typical experimental load demands on the TFTR generators are illustrated based on the electrical characteristics of the field coils, the coil leads, the main bus work, the various auxiliary bus work, the rectifiers, and transformers. The generator MW capacities are shown to be adequate for the proposed experimental operations with allowances made for variations in the final designs. The generator MVA capacities are shown to be adequate provided portions of the TF and EF rectifiers are freewheeled at selected times. (ERA citation 03:013518)
TFTR Generator Load Assessment
1975
52 pages
Report
No indication
English