The prototype for the TFTR Neutral Beam Injection System has been assembled at the Lawrence Berkeley Laboraory, and is presently under test. Some of the construction features of the shielding enclosure, the cryogenic supply system, control and computer area, and the auxiliary vacuum and utility supply system are described. In addition, the paper describes the target chamber, its beam dump and cryopanels, and the duct that connects the target chamber to the injector vessel. (ERA citation 05:009529)
Construction of the Facility for the Testing of the TFTR Neutral Beam Injector
1979
7 pages
Report
No indication
English
TFTR Generator Load Assessment
NTIS | 1975
|Injector/Chamber Scaling Evaluation, Facility Checkout
NTIS | 1969
|Simulation of a condition monitoring scheme for a neutral beam injector cryogenic pump
Automotive engineering | 2014
|