The Kennedy Space Center (KSC) Management System for the Inertial Upper Stage (IUS) - spacecraft processing from KSC arrival through launch is described. The roles and responsibilities of the agencies and test team organizations involved in IUS-S/C processing at KSC for non-Department of Defense missions are described. Working relationships are defined with respect to documentation preparation, coordination and aproval, schedule development and maintenance, test conduct and control, configuration management, quality control and safety. The policy regarding the use of spacecraft contractor test procedures, IUS contractor detailed operating procedures and KSC operations and maintenance instructions is defined. Review and approval requirements for each documentation system are described.
Space Transportation System Cargo Projects: Inertial Stage/Spacecraft Integrationn Plan. Volume 1: Management Plan
1981
76 pages
Report
No indication
English
Astronautics , Manned Spacecraft , Inertial upper stage , Payload integration plan , Project management , Space shuttle payloads , Space shuttles , Space transportation system , Space vehicle checkout program , Systems integration , Coordination , Documentation , Procedures , Quality control , Safety management , Scheduling , Spacecraft configurations
CARGO HANDLING PLAN DEVICE, CARGO HANDLING PLAN METHOD, AND PROGRAM
European Patent Office | 2023
|Transportation Plan Information Management System
British Library Conference Proceedings | 1998
|