The Kennedy Space Center (KSC) Management System for the Inertial Upper Stage (IUS) - spacecraft processing from KSC arrival through launch is described. The roles and responsibilities of the agencies and test team organizations involved in IUS-S/C processing at KSC for non-Department of Defense missions are described. Working relationships are defined with respect to documentation preparation, coordination and aproval, schedule development and maintenance, test conduct and control, configuration management, quality control and safety. The policy regarding the use of spacecraft contractor test procedures, IUS contractor detailed operating procedures and KSC operations and maintenance instructions is defined. Review and approval requirements for each documentation system are described.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Space Transportation System Cargo Projects: Inertial Stage/Spacecraft Integrationn Plan. Volume 1: Management Plan


    Publication date :

    1981


    Size :

    76 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English





    Optimization of Cargo Transportation Plan Considering Carbon Emissions

    Song, Shuxian / Wang, Yiqi / Wang, Shengzhe et al. | ASCE | 2020


    CARGO HANDLING PLAN DEVICE, CARGO HANDLING PLAN METHOD, AND PROGRAM

    TAKEDA SHINGEN / KUCHIKI YUSUKE / HATSUDA HIROKI et al. | European Patent Office | 2023

    Free access

    Transportation Plan Information Management System

    Gill, N. T. / Al-Akhras, A. / American Society of Civil Engineers | British Library Conference Proceedings | 1998


    Advanced Spacecraft Fire Safety: Proposed Projects and Program Plan

    W. W. Youngblood / M. Vedha-nayagam | NTIS | 1989