The Kennedy Space Center (KSC) Management System for the Inertial Upper Stage (IUS) - spacecraft processing from KSC arrival through launch is described. The roles and responsibilities of the agencies and test team organizations involved in IUS-S/C processing at KSC for non-Department of Defense missions are described. Working relationships are defined with respect to documentation preparation, coordination and aproval, schedule development and maintenance, test conduct and control, configuration management, quality control and safety. The policy regarding the use of spacecraft contractor test procedures, IUS contractor detailed operating procedures and KSC operations and maintenance instructions is defined. Review and approval requirements for each documentation system are described.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Space Transportation System Cargo Projects: Inertial Stage/Spacecraft Integrationn Plan. Volume 1: Management Plan


    Erscheinungsdatum :

    1981


    Format / Umfang :

    76 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch





    Optimization of Cargo Transportation Plan Considering Carbon Emissions

    Song, Shuxian / Wang, Yiqi / Wang, Shengzhe et al. | ASCE | 2020


    CARGO HANDLING PLAN DEVICE, CARGO HANDLING PLAN METHOD, AND PROGRAM

    TAKEDA SHINGEN / KUCHIKI YUSUKE / HATSUDA HIROKI et al. | Europäisches Patentamt | 2023

    Freier Zugriff

    Transportation Plan Information Management System

    Gill, N. T. / Al-Akhras, A. / American Society of Civil Engineers | British Library Conference Proceedings | 1998


    Advanced spacecraft fire safety: Proposed projects and program plan

    Youngblood, Wallace W. / Vedha-Nayagam, M. | NTRS | 1989