In 1993, the Michigan Department of Transportation, supported by the Federal Highway Administration, sponsored a study, Metro Detroit Early Deployment Project. Rockwell International served as Prime Contractor, with Dunn Engineering Associates and Hubbell, Roth and Clark as subcontractors. This study required the development of a plan for a Quick Step, an early action IVHS project. That plan is documented in EarIy Deployment of ATMS/ATIS for Metropolitan Detroit, dated February 15, 1994. In addition, the study required that the contractor develop: o A model for preparing a detailed incident management plan o The test and validation of the model on a specific freeway segment and o A Comphensive Incident Response Plan.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    I-75 Corridor Incident Management Plan: IMPLAN. Volume 1


    Publication date :

    1994


    Size :

    73 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English




    Corridor Analysis Guidelines for Incident Management

    S. Lee / R. A. Krammes | NTIS | 1994


    Incident Management System For Santa Monica Smart Corridor

    Karimi, A. / Gupta, A. / Institute of Transportation Engineers | British Library Conference Proceedings | 1993




    Dallas Corridor Frontage Road Evaluation Plan

    C. J. Messer / R. H. Whitson | NTIS | 1973