The report documents the third generation of the freeway model and computer program, FREQ3. The report more thoroughly documents and describes the program and model than either of the two previous reports dealing with the model, and has been written in a manner to avoid any need to refer to those two previous reports. As input the user primarily specifies facility design, capacity, and O-D demand data; the output consists of the simulated freeway performance. The simulation consists of five submodels: (1) On-ramp queueing; (2) on-ramp merging; (3) weaving; (4) mainline travel time and queueing; and (5) off-ramp queueing. Portions of this document are not fully legible.
The FREQ3 Freeway Model. Freeway Operations Study. Phase III
1973
258 pages
Report
No indication
English