The East Coast Main Line is the most recent and significant addition to the British Rail electrified network and has interconnections into other electrified lines along its route between London King's Cross and Edinburgh. The line is in the process of being electrified, the completed part of the route being London to York and the Leeds branch. The electrification system is standard BR 25 kV single phase overhead. Incoming supplies are taken from the national grid network at 16 locations. The author looks at maintenance of the power supply, the overhead equipment, safety and performance management of the electrification equipment.
East Coast Main Line: electrification fixed equipment maintenance
East Coast Main Line: Ausruestungen zur Wartung bei der Elektrifizierung
International Conference on Main Line Railway Electrification ; no.312 ; 134-138
1989
5 Seiten
Conference paper
English
East Coast Main Line electrification-25 kV AC system design
Tema Archive | 1989
|Mk IV passenger vehicles for East Coast Main Line electrification
Tema Archive | 1989
|Engineering Index Backfile | 1930
|Engineering Index Backfile | 1933